Airport Work at the Chathams

Airport Work at the Chathams - Hallo friend MOMENT AND ADVENTURE, In the article you read this time with the title Airport Work at the Chathams, we have prepared well for this article you read and download the information therein. hopefully fill posts items INTERNATIONAL HOTEL, items LOCAL, items PLACE OF TOURISM, items SOUVENIR, items TRAVEL BUREAU, we write this you can understand. Well, happy reading.

Title : Airport Work at the Chathams
link : Airport Work at the Chathams

see also


Airport Work at the Chathams



At present a significant amount of work is being undertaken the Chathams' Tuuta Airport.

Work includes

  • apron repairs to secure areas of fuel damaged seal. 
  • sealing of the driveway and hangar frontages to secure damaged seal and overcome loose seal chip problems. 
  • establishment of a sealed road for Air Chathams Fuel Tanker to stop the transfer of mud and stones onto the apron. 
  • geotechnical test pits and pavement strength tests to gather data for design of the proposed runway extension. 
  • detailed grid survey of the entire airport property and runway for the design of the proposed runway extension. 
  • siting of equipment pads for the new solar lighting system. The current solar powered runway lights with a new aerodrome lighting system, an Avlite Solar system and will include the establishment of approach lights for both ends.


thus Article Airport Work at the Chathams

that is all articles Airport Work at the ChathamsThis time, hopefully can provide benefits to all of you. Okay, see you in another article posting .

You now read the article Airport Work at the Chathams with the link address https://momentandadventure.blogspot.com/2018/07/airport-work-at-chathams.html

Subscribe to receive free email updates:

Related Posts :

0 Response to "Airport Work at the Chathams"

Post a Comment